Solutions for BWMS and Scrubber of Operation Ship

   

1.BWTS/SCRUBBER Design & Evaluation
       According to the drawings and documents on board,study the BWTS/SCRUBBER arrangement plans and preliminary determine the BWTS/SCRUBBER treatment method and equipment type.
2.On-board(3D-Scanning)
        Considering the selected BWTS/SCRUBBER equipment and arrangement on board;determine the equipment arrangement and cable coute;carry out the 3D-Scanning.
3.Approval Design
       According to the requirements of the Classification,prepare the relevant approval drawings,calculation and final drawings.
4.Reverse Process(point-cloudy)
        Edit the point-doudy data(*.pts) and exchange the data into solid data by reverse process.
5.3D Production Design
       Carry out 3D modeling design;provide the fabrication drawings,installation drawings,etc.
6.Equipment Installation Process
        According to the construction drawings,finish the pipe fabrication in workshop and install the BWTS/SCRUBBER equipment on board.
7.BWTS/SCRUBBER System Commissioning
       After the installation,do the commissioning(before commissioning,training and authorization from equipment manufacturer is neoessary).